To register the retransfer of nuclear material, which had been stored at MBA as retained waste, to the nuclear material inventory the user should use the Retransfer from Waste command from the Operations submenu. By default, NUCMAT shows the list of transferred to waste nuclear materials in selected MBA (if any).
Fig. 7.18. Retransfer from retained waste
Then the user should select nuclear materials that should be retransferred from waste by selecting on manufacturer number and providing with flow KMP, retransfer date (see Fig. 7.18). Re-transfer of nuclear material (batch number BV04) automatically added in the General Ledger of MBA (Fig. 7.19) and in the history of material (Fig. 7.20).
Fig. 7.19. Reflection of retransfer to waste operation in General Ledger
Fig. 7.20. Reflection of retransfer to waste operation on history of nuclear material